Location
Type
Price
2
2
Yes
No
In Progress
125 m2
2120€
Download the brochure for this property here.
New 2-bedr. flat with 89m2 terrace in a landmark building renowned for its high-quality construction and finishes.
Construction will start at the end of 2024 and finish at the end of 2026.
The flat has high-quality oak wood carpentry; brushed steel fittings; concealed hinges and magnetic locks; wardrobes with sliding doors; DIERRE armoured entrance doors; floating floorboards; recessed lighting in the ceilings; video intercom system.
Kitchen with lacquered units, equipped with Balay oven, microwave, washing machine, induction hob and combination cooker.
Laundry room with rectified ceramic wall and floor tiles, water heater, 60×60 unit with SILESTONE worktop and stainless steel sink.
Bathrooms with Porcelanosa sanitary ware, NOKEN taps and mixers, suspended furniture, rectified ceramic tiles on the walls and floors, shower trays with glazed cabins.
* Photos of the model floor of the previous building